Plants in operation

Bioeléctrica Uno

Bioeléctrica Uno

Location:

Río Cuarto - Córdoba

Year of Approval:

2015

Substrates:

Industrial by-products and waste, organic waste, cattle manure

Power:

3,2 MW
Bioeléctrica Dos

Bioeléctrica Dos

Location:

Río Cuarto - Córdoba

Year of Approval:

2018

Substrates:

Industrial by-products and waste

Power:

2,4 MW
Bioeléctrica Justo Daract

Bioeléctrica Justo Daract

Location:

Justo Daract - San Luis

Year of Approval:

2019

Substrates:

Food industry by-products and waste, cattle manure, pig slurry, poultry litter, slaughterhouse waste, DAF fats, energy crops

Power:

1,0 MW
Santa Catalina

Santa Catalina

Location:

Santa Catalina - Córdoba

Year of Approval:

2021

Substrates:

Slaughterhouse waste, cattle manure, pig slurry, poultry litter, DAF fats, food industry by-products and waste, energy crops

Power:

2,0 MW
CGY

CGY

Location:

Río Cuarto - Córdoba

Year of Approval:

2020

Substrates:

Industrial by-products and waste

Power:

1,0 MW
Helios Energy

Helios Energy

Location:

Estación General Paz - Córdoba

Year of Approval:

2022

Substrates:

Food industry by-products and waste, slaughterhouse waste, cattle manure, pig slurry, DAF fats, organic waste

Power:

2,4 MW
Villa María del Río Seco - Bioanglo

Villa María del Río Seco - Bioanglo

Location:

Córdoba

Year of Approval:

2024

Substrates:

Pig slurry, rejected cereals, oilseed waste, and energy crops

Power:

1,0 MW
Diaser

Diaser

Location:

Villa Marcedes - San Luis

Year of Approval:

2024

Substrates:

Corn ethanol thin stillage

Power:

2,0 MW
Bell Ville - Bell Ville

Bell Ville - Bell Ville

Location:

Córdoba

Year of Approval:

2024

Substrates:

Refrigeration waste, Pig manure, Guano, Tape waste, Daf fats, and by-products from food industries

Power:

1,0 MW